Projects

Industrial and Especial Projects

200 kWp Ground‑Mounted Solar Power Plant 

In partnership with UNIDO, CAESL successfully delivered the full engineering, procurement, construction, installation, and commissioning of a 200 kWp groundmounted solar photovoltaic (PV) power plant designed to supply clean, reliable electricity to a large residential settlement. The project combined advanced technical design, rigorous site assessments, and highquality construction practices to create a robust renewableenergy system tailored to local environmental and operational needs. 

The project involved the complete lifecycle of a utilityscale solar installation, including: 

  • Detailed topographical, geotechnical, and geoelectrical investigations 
  • Structural and electrical system design 
  • Procurement of highefficiency bifacial PV modules and utilitygrade inverters 
  • Civil works, foundations, and steel mounting structures 
  • AC and DC electrical installation 
  • Earthing, lightning protection, and safety systems 
  • Trial run, testing, and commissioning 
  • Operator training and capacity building 

The system was engineered to integrate seamlessly with the settlement’s internal electrical network, supplying the majority of its daytime energy demand. 

The plant is expected to generate around 410,500 kWh per year, achieving a Performance Ratio of 85.7%. Most of the energy is consumed onsite, significantly reducing grid dependence and operational energy costs. 

The system avoids nearly 200 tonnes of CO₂ emissions annually, strengthens energy reliability for the settlement, and reduces longterm electricity expenditure. CAESL also delivered handson training covering system operation, monitoring, and maintenance to ensure longterm sustainability. 

Solar PV arrays installed at the 200 kWp ground-mounted power plant
Ground-mounted solar PV panels at the completed 200 kWp power plant